Projected cost excel formula, help asap!?

SassySunshine

New member
Joined
Mar 11, 2013
Messages
0
Reaction score
0
Points
0
Here are the instructions:
insert a formula that will calculate the projected operations cost after the forecasted increase in cell B30 (3.5%) is added to the 2016 total (in B32).
I am assuming she wants something from the formula bar but i will take whatever i can get. Thanks!
 
Back
Top